Skip to content

Refurbishment Project – Retallack

As part of a refurbishment programme at a local holiday park BWF were contracted to install a new Reception / office combined with a Farm shop. Built along-side the new Gym room and the re cladding of the old façade on the existing building, all three elements complement one another through the cladding and finishes used and bring the new entrance bang up to date .
The SIPS built turnkey projects were timber clad in vertical Kiln Dried Siberian Larch and the Reception with large windows and doors has created a fresh light open contemporary space, while the gym room offers a light airy space for their weights room.
An EPDM rubber roofing system provides a 35 year finish and the Larch which will naturally silver down, combined with the wavy cement board on the Reception/ Farm shop is a low maintenance solution and also fits in well with the surroundings.

Leave a Reply

Your email address will not be published. Required fields are marked *

Pin It on Pinterest

Share This