Skip to content

SIPS Roof in Cornwall

Complex SIPS Roof in Flushing

The last phase of our complex sips roof installed in Flushing, where the main roof was completed by our team last year and then we installed the last panels for the pool roof over oak framed trusses.

A truly spectacular building, being built to very precise accuracy with great tradespeople.

  • Want to work on something similar?

    Drop us a line - we'd love to hear from you - if you would like to discuss options for your next project.

  • This field is for validation purposes and should be left unchanged.

Pin It on Pinterest