Skip to content

Albi Court – St Austell

The clients brief for this “off site” project at St Austell consisted of ground works, alterations to services & preparing the site ready to install an engineered raft slab. Followed by the delivery, cranage and connections to the new offsite constructed SIPS building.

Works include:

Construction of engineered raft slab
Extensions to existing services
General landscaping
Delivery and siting of offsite constructed building
Connections and commissioning

The site is used for the residential care of adults with learning difficulties or disabilities. Previously the staff were using one of the residential flats as an office space and a communal area for the residence to be able to socialise with others in the complex. The intention for the new building is to free up this flat, without comprising the staff and communal space.

Built using SIP panel construction, clad with Kiln Dried Siberian Larch and an EDPM covered roof. Built off site in two sections, craned on to site and seamlessly linked. The off site work ensured minimal time was spent on site, reducing disruption.

The turnkey building, designed and constructed in line with current building regulations, is a fully functioning annex style building complete with high specification kitchen and shower room.

We hope the clients enjoy the extra facilities and space that BWF are delighted to have delivered

 

 

 

.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  • Want to work on something similar?

    Drop us a line - we'd love to hear from you - if you would like to discuss options for your next project.

  • This field is for validation purposes and should be left unchanged.

Pin It on Pinterest